[1] Crespo Márquez, A. (2007). The maintenance management framework : models and methods for complex systems maintenance. Springer.
[2] Mehmet Emin Suntay LCA second assignment
[3] Nour Arabi Katibi LCA second assignment
[4] Nicholas Song LCA second assignment
[5] Rozh Rozgar Abbas LCA second assignment
[6] Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. A. M. T. (2002). A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE transactions on evolutionary computation, 6(2), 182-197. doi: 10.1109/4235.996017
[7] De Weck, O. L. (2004, October). Multiobjective optimization: History and promise. In Invited Keynote Paper, GL2-2, The Third China-Japan-Korea Joint Symposium on Optimization of Structural and Mechanical Systems, Kanazawa, Japan (Vol. 2, p. 34).
[8] Sphera Solutions GmbH. (2024). WDVS Verklebung und Beschichtung Leichtputz mineralisch [Dataset]. In OEKOBAUDAT (Version 20.24.070, OBD_2024_I). Federal Institute for Research on Building, Urban Affairs and Spatial Development (BBSR). https://oekobaudat.de/OEKOBAU.DAT/datasetdetail/process.xhtml?uuid=7e8801e0-c0e4-4995-bf8a-883181f6aa20&version=20.24.070&stock=OBD_2024_I&lang=de
[9] Cascione, V., Roberts, M., Allen, S., Charbel, C., Maskell, D., Dams, B., … & Emmitt, S. (2025). Evaluating environmental impacts of bio-based insulation materials through scenario-based and dynamic life cycle assessment. The International Journal of Life Cycle Assessment, 30(4), 601-620.
[10] Sulakatko, V., Lill, I., & Witt, E. (2016). Methodological framework to assess the significance of External Thermal Insulation Composite System (ETICS) on-site activities. Energy Procedia, 96, 446-454.
[11] Schulze Spüntrup, F., Ave, G. D., Imsland, L., & Harjunkoski, I. (2022). Integration of maintenance scheduling and planning for large-scale asset fleets. Optimization and Engineering, 23(3), 1255-1287.
[12] Chouikhi, H., Khatab, A., & Rezg, N. (2026). A Multi-objective Condition-based Sustainable Maintenance Optimization Model in Stochastic Degrading Production Systems. Process Integration and Optimization for Sustainability, 1-17.
[13] Gkonou, N., Nisyrios, E., & Gkiotsalitis, K. (2023). Combined optimization of maintenance works and crews in railway networks. Applied Sciences, 13(18), 10503.
[14] Cohn, A. M., & Barnhart, C. (2003). Improving crew scheduling by incorporating key maintenance routing decisions. Operations Research, 51(3), 387-396.
[15] Zanjani, M. K., & Nourelfath, M. (2014). Integrated spare parts logistics and operations planning for maintenance service providers. International Journal of Production Economics, 158, 44-53.
[16] Achermann, D. (2008). Modelling, simulation and optimization of maintenance strategies under consideration of logistic processes (Doctoral dissertation, ETH Zurich).
[17] Budiono, A. L., Siswanto, N., & Kurniati, N. (2021, February). Modeling opportunistic maintenance using discrete event simulation. In IOP Conference Series: Materials Science and Engineering (Vol. 1072, No. 1, p. 012045). IOP Publishing.
[18] Huynh, K. T., Barros, A., & Bérenguer, C. (2012). Adaptive condition-based maintenance decision framework for deteriorating systems operating under variable environment and uncertain condition monitoring. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 226(6), 602-623.
R Codes:
Home | System Definition | Scenario 1 | Scenario 2 | Scenario 3 | Scenario 4 | Discussion | Appendix