{"id":7503,"date":"2021-02-24T23:07:01","date_gmt":"2021-02-24T23:07:01","guid":{"rendered":"http:\/\/141.23.68.248\/wp\/?page_id=7503"},"modified":"2021-02-25T00:39:30","modified_gmt":"2021-02-25T00:39:30","slug":"2-maintenance-strategy-of-individual-systems","status":"publish","type":"page","link":"http:\/\/141.23.68.248\/wp\/?page_id=7503","title":{"rendered":"2.1 Maintenance Strategy of Individual Systems"},"content":{"rendered":"<p>As a first step, the timeline model was defined as a function including the lifetime, the occurring maintenance events as well as their frequency and duration. All events were combined in one list. The choice of a common lifetime was problematic since each system has its own lifetime depending on technical and environmental conditions.\u00a0The lifetime of 50 years was set for all systems. For the <a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4286\">Xpelair<\/a>, with a lifetime of 5 years, conversions needed to be done to meet the compromise.\u00a0Thus, the interventions were multiplied by the factor 10 in order to keep the calculation with a linear approximation simple.<\/p>\n<figure id=\"attachment_6649\" aria-describedby=\"caption-attachment-6649\" style=\"width: 778px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/210224_Maintenance-Strategy_Table.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6649 size-full\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/210224_Maintenance-Strategy_Table.jpg\" alt=\"210224_maintenance-strategy_table\" width=\"778\" height=\"188\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/210224_Maintenance-Strategy_Table.jpg 778w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/210224_Maintenance-Strategy_Table-300x72.jpg 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/210224_Maintenance-Strategy_Table-520x126.jpg 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/210224_Maintenance-Strategy_Table-740x179.jpg 740w\" sizes=\"auto, (max-width: 778px) 100vw, 778px\" \/><\/a><figcaption id=\"caption-attachment-6649\" class=\"wp-caption-text\"><em><span style=\"text-decoration: underline;\">Table 2.1.1 : Lifetime of the subsystems<\/span><\/em><\/figcaption><\/figure>\n<p>Subsequently, an iteration was implemented to include all possible scenarios between the systems, with a total of 15 combinations. After setting the start date and the lifetime, each event as well as its frequency and duration were implemented for the four individual systems. The following events were defined and visualized by a timeline for each subsystem:<\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4284\"><strong>Wooden\u00a0Frame <\/strong><\/a><\/p>\n<ul>\n<li>Replacement of the <strong>shallow Frame overlay<\/strong> (SFO)<\/li>\n<li>General <strong>maintenance<\/strong> of the Frame (M.F)<\/li>\n<li><strong>Frame Replacement<\/strong> (F.R)<\/li>\n<\/ul>\n<figure id=\"attachment_6650\" aria-describedby=\"caption-attachment-6650\" style=\"width: 664px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/001.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6650 size-full\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/001.jpg\" alt=\"001\" width=\"664\" height=\"292\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/001.jpg 664w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/001-300x132.jpg 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/001-520x229.jpg 520w\" sizes=\"auto, (max-width: 664px) 100vw, 664px\" \/><\/a><figcaption id=\"caption-attachment-6650\" class=\"wp-caption-text\"><span style=\"text-decoration: underline;\"><em>Fig 2.1.1 : Wood frame&#8217;s Life Cycle<\/em><\/span><\/figcaption><\/figure>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4286\"><strong>Xpelair<\/strong><\/a><\/p>\n<ul>\n<li><strong>Filter replacement<\/strong> (FR)<\/li>\n<li><strong>Filter maintenance<\/strong> (FM)<\/li>\n<\/ul>\n<figure id=\"attachment_6651\" aria-describedby=\"caption-attachment-6651\" style=\"width: 652px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/002.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6651 size-full\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/002.png\" alt=\"002\" width=\"652\" height=\"270\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/002.png 652w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/002-300x124.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/002-520x215.png 520w\" sizes=\"auto, (max-width: 652px) 100vw, 652px\" \/><\/a><figcaption id=\"caption-attachment-6651\" class=\"wp-caption-text\"><span style=\"text-decoration: underline;\"><em>Fig 2.1.2 : Xpelair Lifecycle<\/em><\/span><\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4288\"><strong>Stellio<\/strong><\/a><\/p>\n<ul>\n<li><strong>Maintenance<\/strong> of the Stellio (M.S) including inspections and service<\/li>\n<li><strong>Replacement of Mirrors<\/strong> (RM) caused by natural causes<\/li>\n<li><strong>Replacement motion and control systems<\/strong> (RMC) caused by environmental impacts<\/li>\n<\/ul>\n<figure id=\"attachment_6652\" aria-describedby=\"caption-attachment-6652\" style=\"width: 636px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/003.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6652 size-full\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/003.jpg\" alt=\"003\" width=\"636\" height=\"250\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/003.jpg 636w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/003-300x118.jpg 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/003-520x204.jpg 520w\" sizes=\"auto, (max-width: 636px) 100vw, 636px\" \/><\/a><figcaption id=\"caption-attachment-6652\" class=\"wp-caption-text\"><span style=\"text-decoration: underline;\"><em>Fig 2.1.3 : Stellio Lifecycle<\/em><\/span><\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4290\"><strong>Isolated Footing<\/strong><\/a><\/p>\n<ul>\n<li><strong>Maintenance<\/strong> (M.I) such as plastering or painting<\/li>\n<li><strong>Grouting <\/strong>(G) to stabilize the soil or fill any cracks<\/li>\n<li><strong>Replacement<\/strong> of the Isolated Footing (R.I) due to deterioration from ground water or other factors<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_6653\" aria-describedby=\"caption-attachment-6653\" style=\"width: 647px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/004.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6653 size-full\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/004.png\" alt=\"004\" width=\"647\" height=\"256\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/004.png 647w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/004-300x119.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/004-520x206.png 520w\" sizes=\"auto, (max-width: 647px) 100vw, 647px\" \/><\/a><figcaption id=\"caption-attachment-6653\" class=\"wp-caption-text\"><span style=\"text-decoration: underline;\"><em>Fig 2.1.4 : Isolated Footing&#8217;s Lifecycle<\/em><\/span><\/figcaption><\/figure>\n<hr \/>\n<p>&nbsp;<\/p>\n<p style=\"text-align: left;\"><span style=\"text-decoration: underline;\"><strong>Page Navigation<\/strong><\/span><\/p>\n<p style=\"text-align: left;\"><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4272\">1. Integration Context<\/a><\/p>\n<p style=\"text-align: left;\"><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4276\">2. Maintenance Strategy\u00a0<\/a><\/p>\n<p>\u00a0 \u00a0\u00a0<a href=\"http:\/\/141.23.68.248\/wp\/?page_id=7503\">2.1 Maintenance Strategy of Individual Systems<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=7509\">\u00a02.2 Integrated Maintenance Strategy<\/a><\/p>\n<p style=\"text-align: left;\"><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4278\">3. Life-Cycle Inventory Analysis<\/a><\/p>\n<p style=\"text-align: left;\"><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4280\">4. Multi-Objective Optimization<\/a><\/p>\n<p style=\"text-align: left;\"><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=4282\">5. Interpretations and Decision making<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As a first step, the timeline model was defined as a function including the lifetime, the occurring maintenance events as well as their frequency and duration. All events were combined in one list. The choice<a class=\"read-more\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=7503\">Continue reading<\/a><\/p>\n","protected":false},"author":72,"featured_media":0,"parent":4276,"menu_order":1,"comment_status":"closed","ping_status":"open","template":"page-templates\/page_fullwidth.php","meta":{"footnotes":""},"class_list":["post-7503","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/7503","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/users\/72"}],"replies":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7503"}],"version-history":[{"count":10,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/7503\/revisions"}],"predecessor-version":[{"id":7626,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/7503\/revisions\/7626"}],"up":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/4276"}],"wp:attachment":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7503"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}