{"id":5521,"date":"2021-02-22T08:28:37","date_gmt":"2021-02-22T08:28:37","guid":{"rendered":"http:\/\/141.23.68.248\/wp\/?page_id=5521"},"modified":"2021-02-23T05:23:02","modified_gmt":"2021-02-23T05:23:02","slug":"integrated-city-model-2","status":"publish","type":"page","link":"http:\/\/141.23.68.248\/wp\/?page_id=5521","title":{"rendered":"Integrated parametric model"},"content":{"rendered":"<p>After the individual parametric projects have been presented, they are integrated in this section.<br \/>\nFor this we have chosen a 4800m\u00b2 plot of land on which we have defined the two-storey residential building complex in the zero point. The event hall, on the other hand, is free to move around the site.<br \/>\nDecentralised ventilation units (DVS) have been installed in both the residential building and the event hall to support and meet the targets.<br \/>\nFor the residential building, the second assignment stated the goal of keeping the heat transfer through the building envelope as low as possible.\u00a0To support energy reduction, decentralized ventilation systems (DVS) with a heat recovery of 90% were installed in the building envelope.<br \/>\nIn the event hall, heat recovery is rather secondary. Here, sufficient air exchange is important; at the same time, the DVS helps to reduce noise pollution, because with the right configuration, noise-intensive window ventilation can be dispensed with.<br \/>\nTo keep the CPU load as low as possible, we have decided to exclude the doors and windows and to show only one DVS in the programme, but its configuration can be scaled and dublicated.<\/p>\n<p>The dimensions of the residential building can be scaled from a minimum configuration of 500m\u00b3 room volume up to a room volume of 2450m\u00b3, while the event hall<\/p>\n<p>&nbsp;<\/p>\n<h2><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-46-41.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5887\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-46-41.png\" alt=\"assignment-iii_group5_2021-02-22_07-46-41\" width=\"1021\" height=\"711\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-46-41.png 1021w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-46-41-300x209.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-46-41-520x362.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-46-41-740x515.png 740w\" sizes=\"auto, (max-width: 1021px) 100vw, 1021px\" \/><\/a><\/h2>\n<p><em>Figure 2: minimum configuration (500m\u00b3)<\/em><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-48-10.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5888\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-48-10.png\" alt=\"assignment-iii_group5_2021-02-22_07-48-10\" width=\"1021\" height=\"711\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-48-10.png 1021w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-48-10-300x209.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-48-10-520x362.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_07-48-10-740x515.png 740w\" sizes=\"auto, (max-width: 1021px) 100vw, 1021px\" \/><\/a><\/p>\n<p><em>Figure 3: maximum configuration<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>The model represents a low-rise building for commercial purposes, designated as an event hall. The designed model aims to reduce the noise pollution generated. At the same time, sufficient air circulation must be ensured in the building, which is why decentralised ventilation is also used here. Since these ventilations are not made for large events such as concerts, this event hall is primarily used for theatre, readings or similar.<br \/>\nFor this design, the parametric configuration between length and width of the building elements is considered.<br \/>\nThe parameters can be selected in the integrated dynamo model in 50 cm or 100 cm steps.<br \/>\nThe minimum and maximum configurations are:<\/p>\n<ol>\n<li><span style=\"font-weight: 400;\">\u00a0 \u00a0 \u00a0 Width: 5m &#8211; 10m<br \/>\n<\/span><\/li>\n<li><span style=\"font-weight: 400;\">\u00a0 \u00a0 \u00a0 Length:\u00a020m &#8211; 35m<\/span><\/li>\n<li><span style=\"font-weight: 400;\">\u00a0 \u00a0 \u00a0 Height: 2.5m &#8211; 4.5m<br \/>\n<\/span><\/li>\n<\/ol>\n<p style=\"text-align: left;\">Furthermore, the location can be moved between 5m and 50m away from the residential building complex. Depending on the type of use and the position of the building, this will try to keep the noise level arriving at the residential building as low as possible.<br \/>\nAn explicit noise calculation has not been carried out for our model.<br \/>\nTo keep CPU power as low as possible, the integrated model does without windows and doors.<\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-50-571.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5877\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-50-571.png\" alt=\"assignment-iii_group5_2021-02-22_06-50-57\" width=\"1021\" height=\"711\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-50-571.png 1021w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-50-571-300x209.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-50-571-520x362.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-50-571-740x515.png 740w\" sizes=\"auto, (max-width: 1021px) 100vw, 1021px\" \/><\/a><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-50-571.png\"><br \/>\n<\/a><\/p>\n<p><em>Figure 2: Smallest configuration (250m\u00b3), near by the residential building complex<\/em><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-52-291.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5876\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-52-291.png\" alt=\"assignment-iii_group5_2021-02-22_06-52-29\" width=\"1021\" height=\"711\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-52-291.png 1021w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-52-291-300x209.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-52-291-520x362.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-52-291-740x515.png 740w\" sizes=\"auto, (max-width: 1021px) 100vw, 1021px\" \/><\/a><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5_2021-02-22_06-52-291.png\"><br \/>\n<\/a><br \/>\n<em>Figure 3: Largest configuration (1575m\u00b3),\u00a0furthest away on the property.<\/em><\/p>\n<p>To Download the Dynamo File, please click below:<\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5.dyn\">Download_Group_5_Integrated_Model<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=5518\"><\/p>\n<p><\/a>Next page:<a href=\"http:\/\/141.23.68.248\/wp\/?page_id=5518\"><br \/>\nCombined Ontologies | Virtual City Model<\/a><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Assignment-III_Group5.dyn\"><br \/>\n<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>After the individual parametric projects have been presented, they are integrated in this section. For this we have chosen a 4800m\u00b2 plot of land on which we have defined the two-storey residential building complex in<a class=\"read-more\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=5521\">Continue reading<\/a><\/p>\n","protected":false},"author":83,"featured_media":0,"parent":3601,"menu_order":4,"comment_status":"closed","ping_status":"open","template":"page-templates\/page_fullwidth.php","meta":{"footnotes":""},"class_list":["post-5521","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/5521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/users\/83"}],"replies":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5521"}],"version-history":[{"count":13,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/5521\/revisions"}],"predecessor-version":[{"id":6388,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/5521\/revisions\/6388"}],"up":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/3601"}],"wp:attachment":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}