{"id":4392,"date":"2021-02-18T13:48:12","date_gmt":"2021-02-18T13:48:12","guid":{"rendered":"http:\/\/141.23.68.248\/wp\/?page_id=4392"},"modified":"2021-02-25T02:54:54","modified_gmt":"2021-02-25T02:54:54","slug":"integrated-maintenance-planning","status":"publish","type":"page","link":"http:\/\/141.23.68.248\/wp\/?page_id=4392","title":{"rendered":"Integrated maintenance planning"},"content":{"rendered":"<h3>3. Integrated maintenance planning<\/h3>\n<p>Different scenarios for maintenance strategies for the integrated system model are created by combining the individual maintenance plans.<\/p>\n<p>&nbsp;<\/p>\n<h4><a title=\"Individual systems maintenance strategies with the Integration context\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=6451\">3.1 Individual systems maintenance strategies<\/a><\/h4>\n<p>The individual maintenance strategies for the sub-systems are displayed separately and in a combined plot of the timeline.<\/p>\n<p>&nbsp;<\/p>\n<h4><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=6673\">3.2 Bundled maintenance strategy<\/a><\/h4>\n<p>Analyzing the individual maintenance strategies has shown possibilities to bundle maintenance work that takes place at similar times. One scenario for which the interventions were bundled manually is visualized by individual sub-systems timelines and a combined timeline.<\/p>\n<p>&nbsp;<\/p>\n<h4><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=6675\">3.3 Exploration of multiple maintenance scenarios<\/a><\/h4>\n<p>The automated combination of multiple maintenance bundling scenarios enables a broader analysis. The results are visualized in a combined plot. For a better understanding of the results pareto frontier plots are used.<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p><strong>Navigation<\/strong><\/p>\n<p><a title=\"Group 3\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=4319\">Home\u00a0<\/a><\/p>\n<p style=\"text-align: left;\"><a title=\"Integrated life-cycle analysis\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=4394\">Integrated life-cycle analysis<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>3. Integrated maintenance planning Different scenarios for maintenance strategies for the integrated system model are created by combining the individual maintenance plans. &nbsp; 3.1 Individual systems maintenance strategies The individual maintenance strategies for the sub-systems<a class=\"read-more\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=4392\">Continue reading<\/a><\/p>\n","protected":false},"author":95,"featured_media":0,"parent":4319,"menu_order":3,"comment_status":"closed","ping_status":"open","template":"page-templates\/page_fullwidth.php","meta":{"footnotes":""},"class_list":["post-4392","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/4392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/users\/95"}],"replies":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4392"}],"version-history":[{"count":8,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/4392\/revisions"}],"predecessor-version":[{"id":7687,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/4392\/revisions\/7687"}],"up":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/4319"}],"wp:attachment":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}