{"id":3898,"date":"2021-02-14T07:26:56","date_gmt":"2021-02-14T07:26:56","guid":{"rendered":"http:\/\/141.23.68.248\/wp\/?page_id=3898"},"modified":"2021-02-23T23:09:07","modified_gmt":"2021-02-23T23:09:07","slug":"vertical-lift-bridge","status":"publish","type":"page","link":"http:\/\/141.23.68.248\/wp\/?page_id=3898","title":{"rendered":"Vertical lift Bridge"},"content":{"rendered":"<p>This lift bridge is located over the Kaiser Wilhelm channel, near Brunsb\u00fcttel port. It has a total length of 260 meters and its mainly made of concrete. The bridge has 2 pairs of steel structure towers through which the lift span can move upward and downwards, allowing a clearance for vessels to cross. A picture of the bridge can be seen below:<\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Sir-Ambrose-Shea-Lift-Bridge-Plancentia-NL_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6492\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Sir-Ambrose-Shea-Lift-Bridge-Plancentia-NL_2.jpg\" alt=\"sir-ambrose-shea-lift-bridge-plancentia-nl_2\" width=\"690\" height=\"475\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Sir-Ambrose-Shea-Lift-Bridge-Plancentia-NL_2.jpg 690w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Sir-Ambrose-Shea-Lift-Bridge-Plancentia-NL_2-300x207.jpg 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Sir-Ambrose-Shea-Lift-Bridge-Plancentia-NL_2-520x358.jpg 520w\" sizes=\"auto, (max-width: 690px) 100vw, 690px\" \/><\/a><\/p>\n<p><span style=\"text-decoration: underline;\">Geometry and materials<\/span><\/p>\n<p>The subsystem chosen for the life cycle analysis is the lift span, located in the center of the total length. This span has 33 meters long and 12.1 meters wide.<\/p>\n<p>The structural design of the deck consists of an open deck grating with longitudinal box steel girders and transversal beams with section W610x217. A cross-section of the lift span can be seen in the picture below:<\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/cross-section-lift-span.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6494\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/cross-section-lift-span.png\" alt=\"cross-section-lift-span\" width=\"567\" height=\"226\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/cross-section-lift-span.png 567w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/cross-section-lift-span-300x120.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/cross-section-lift-span-520x207.png 520w\" sizes=\"auto, (max-width: 567px) 100vw, 567px\" \/><\/a><\/p>\n<p><span style=\"text-decoration: underline;\">Maintenance interventions<\/span><\/p>\n<p>The lifetime of the system is defined as 70 years. \u00a0During that period, regular maintenance actions must be carried out over the subsystem. These actions are:<\/p>\n<p>1. Regular maintenance<br \/>\nIntervals: every 3 years<br \/>\nDuration: 2 days<\/p>\n<p>2. Deck replacement<br \/>\nIntervals: every 20 years<br \/>\nDuration: 14 days<\/p>\n<p>3. Re-painting<br \/>\nIntervals: every 3 years<br \/>\nDuration: 2 days<\/p>\n<p>The timeline below shows the interventions along the system lifetime:<br \/>\n<a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/timeline-bassel.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6495\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/timeline-bassel.png\" alt=\"timeline-bassel\" width=\"567\" height=\"114\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/timeline-bassel.png 567w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/timeline-bassel-300x60.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/timeline-bassel-520x105.png 520w\" sizes=\"auto, (max-width: 567px) 100vw, 567px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This lift bridge is located over the Kaiser Wilhelm channel, near Brunsb\u00fcttel port. It has a total length of 260 meters and its mainly made of concrete. The bridge has 2 pairs of steel structure<a class=\"read-more\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=3898\">Continue reading<\/a><\/p>\n","protected":false},"author":82,"featured_media":0,"parent":3891,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-3898","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/3898","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/users\/82"}],"replies":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3898"}],"version-history":[{"count":2,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/3898\/revisions"}],"predecessor-version":[{"id":6496,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/3898\/revisions\/6496"}],"up":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/3891"}],"wp:attachment":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3898"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}