{"id":3655,"date":"2021-02-02T10:35:46","date_gmt":"2021-02-02T10:35:46","guid":{"rendered":"http:\/\/141.23.68.248\/wp\/?page_id=3655"},"modified":"2021-02-22T21:56:32","modified_gmt":"2021-02-22T21:56:32","slug":"1-3-prestressed-concrete-viaduct","status":"publish","type":"page","link":"http:\/\/141.23.68.248\/wp\/?page_id=3655","title":{"rendered":"1.3 Prestressed Concrete Viaduct"},"content":{"rendered":"<p style=\"text-align: center;\"><strong>1. Introduction<\/strong><\/p>\n<p style=\"text-align: left;\">With the rising need for faster surface transport, diverting roads away from rough terrain is no longer an option. This is where the need for Viaducts comes in.<\/p>\n<p style=\"text-align: center;\"><strong>2. Ontological Model<\/strong><\/p>\n<p style=\"text-align: left;\">The ontological model\u00a0is developed to represent the conceptual design of Viaducts with respect to different structural components, possible materials, the sequence of construction, stakeholder scope, and their relations. The intended end-users are the viaduct design, planning and billing engineers.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Viaduct-Components.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4112 size-full\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Viaduct-Components.png\" alt=\"Viaduct Components\" width=\"626\" height=\"233\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Viaduct-Components.png 626w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Viaduct-Components-300x112.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Viaduct-Components-520x194.png 520w\" sizes=\"auto, (max-width: 626px) 100vw, 626px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><em>Figure 1: Viaduct &#8211; Structural Components (geometric)<\/em><\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/VDom.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4109 size-full\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/VDom.png\" alt=\"Viaduct Domain\" width=\"581\" height=\"641\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/VDom.png 581w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/VDom-272x300.png 272w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/VDom-520x574.png 520w\" sizes=\"auto, (max-width: 581px) 100vw, 581px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><em>Figure 2: Viaduct &#8211; Structural Components (ontological)<br \/>\n<\/em><\/p>\n<p style=\"text-align: left;\">The above figures 1 and 2 show the geometric and ontological representation of Viaduct structural components.<\/p>\n<p style=\"text-align: left;\">We also generate the construction sequence by establishing relationships. The graph generated shows the possibilities where the construction process can be performed\u00a0parallelly:<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Out-come-Seq_1.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4174\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Out-come-Seq_1.png\" alt=\"Viaduct-Sequence\" width=\"864\" height=\"270\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Out-come-Seq_1.png 1590w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Out-come-Seq_1-300x94.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Out-come-Seq_1-1024x320.png 1024w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Out-come-Seq_1-520x163.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Out-come-Seq_1-740x231.png 740w\" sizes=\"auto, (max-width: 864px) 100vw, 864px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><em>Figure 3: Viaduct-Construction Sequence<\/em><\/p>\n<p style=\"text-align: left;\">We also use the ontological model to define the stakeholder scope and relations, as shown in the figure below:<br \/>\n<a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/StakeHolder.png\"><img loading=\"lazy\" decoding=\"async\" class=\"  aligncenter wp-image-4173\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/StakeHolder.png\" alt=\"Viaduct-Stakeholders\" width=\"592\" height=\"290\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/StakeHolder.png 1066w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/StakeHolder-300x147.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/StakeHolder-1024x501.png 1024w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/StakeHolder-520x255.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/StakeHolder-740x362.png 740w\" sizes=\"auto, (max-width: 592px) 100vw, 592px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><em>Figure 4: Viaduct-Strategies<\/em><\/p>\n<p style=\"text-align: left;\">The following link provides you with the .owl file:<\/p>\n<p style=\"text-align: left;\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/prestressed-concrete-viaduct-ontology.owl\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-6010 \" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/owl-300x138.png\" alt=\"owl\" width=\"128\" height=\"59\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/owl-300x138.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/owl-520x238.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/owl.png 600w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><strong>3. Parametric Model<\/strong><\/p>\n<p style=\"text-align: left;\">The main constraint of the model is the location of the bridge being in a river valley.<\/p>\n<p style=\"text-align: left;\">The following diagram illustrates the effect of this geometry on the model and the interdependencies within the system.\u00a0 This geometry is also implemented in the <a title=\"Integrated model\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=3659\">integrated model<\/a>.<br \/>\n<a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Capture.png\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-4180  aligncenter\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Capture.png\" alt=\"Viaduct-Interdependencies\" width=\"814\" height=\"488\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Capture.png 1713w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Capture-300x180.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Capture-1024x614.png 1024w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Capture-520x312.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/Capture-740x444.png 740w\" sizes=\"auto, (max-width: 814px) 100vw, 814px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><em>Figure 5: Viaduct-Geometric constraints and system interdependencies<\/em><\/p>\n<p>The main\u00a0objective of the design\u00a0is to model a viaduct having minimum length i.e. minimum height and optimal span while ensuring both vertical and horizontal clearance[] respectively for the ship movement, with an aim of reducing total quantity. The objective of ship movement can be resolved by implementing the idea of a <a href=\"http:\/\/141.23.68.248\/wp\/?page_id=3651\">vertical lift bridge<\/a> and this resolution is further discussed in the <a href=\"http:\/\/141.23.68.248\/wp\/?page_id=3649\">integration context<\/a>.<\/p>\n<p>Here, you can see the visualization of the parametric model:<\/p>\n<iframe loading=\"lazy\" frameborder=\"0\" height=\"546\" width=\"1092\" webkitallowfullscreen=\"true\" mozallowfullscreen=\"true\" src=\"https:\/\/sketchfab.com\/models\/238a84be8ec34e278193890a67f8bdf8\/embed?autostart=0&autospin=&controls=0&transparent=\"><\/iframe>\n<div class=\"sketchfab-embed-wrapper\">\n<p>The following link provides you with the .dyn file:<\/p>\n<hr \/>\n<p>go to<\/p>\n<figure id=\"attachment_3733\" aria-describedby=\"caption-attachment-3733\" style=\"width: 241px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=3651\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3733\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/011_vertical-Bridge-300x197.png\" alt=\"vertical lift bridge\" width=\"241\" height=\"158\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/011_vertical-Bridge-300x197.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/011_vertical-Bridge-520x341.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/011_vertical-Bridge.png 563w\" sizes=\"auto, (max-width: 241px) 100vw, 241px\" \/><\/a><figcaption id=\"caption-attachment-3733\" class=\"wp-caption-text\">vertical lift bridge<\/figcaption><\/figure>\n<figure id=\"attachment_3735\" aria-describedby=\"caption-attachment-3735\" style=\"width: 132px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=3653\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3735\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/013_wind-197x300.png\" alt=\"onshore wind turbine\" width=\"132\" height=\"201\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/013_wind-197x300.png 197w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/013_wind.png 431w\" sizes=\"auto, (max-width: 132px) 100vw, 132px\" \/><\/a><figcaption id=\"caption-attachment-3735\" class=\"wp-caption-text\">onshore wind turbine<\/figcaption><\/figure>\n<figure id=\"attachment_4972\" aria-describedby=\"caption-attachment-4972\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=3649\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-4972\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/014_context1-300x174.png\" alt=\"integration context\" width=\"300\" height=\"174\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/014_context1-300x174.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/014_context1-1024x595.png 1024w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/014_context1-520x302.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/014_context1-740x430.png 740w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2021\/02\/014_context1.png 1532w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-4972\" class=\"wp-caption-text\">integration context<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>Reference:<br \/>\n[1]\u00a0Guide Clearances, 33 CFR Chapter 1, Subchapter J \u2013 Bridges, United States Coast Guard, U.S. Department of<br \/>\nHomeland Security<br \/>\n&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1. Introduction With the rising need for faster surface transport, diverting roads away from rough terrain is no longer an option. This is where the need for Viaducts comes in. 2. Ontological Model The ontological<a class=\"read-more\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=3655\">Continue reading<\/a><\/p>\n","protected":false},"author":75,"featured_media":0,"parent":3647,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-3655","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/3655","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/users\/75"}],"replies":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3655"}],"version-history":[{"count":41,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/3655\/revisions"}],"predecessor-version":[{"id":6148,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/3655\/revisions\/6148"}],"up":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/3647"}],"wp:attachment":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}