{"id":16713,"date":"2024-02-09T10:06:12","date_gmt":"2024-02-09T10:06:12","guid":{"rendered":"http:\/\/141.23.68.248\/wp\/?page_id=16713"},"modified":"2024-02-14T09:57:24","modified_gmt":"2024-02-14T09:57:24","slug":"1st-child","status":"publish","type":"page","link":"http:\/\/141.23.68.248\/wp\/?page_id=16713","title":{"rendered":"Group D"},"content":{"rendered":"<p style=\"text-align: center;\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-13-at-20.14.45_1834cdfd.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-18752\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-13-at-20.14.45_1834cdfd.jpg\" alt=\"whatsapp-image-2024-02-13-at-20-14-45_1834cdfd\" width=\"620\" height=\"565\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-13-at-20.14.45_1834cdfd.jpg 620w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-13-at-20.14.45_1834cdfd-300x273.jpg 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-13-at-20.14.45_1834cdfd-520x474.jpg 520w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Introduction<\/strong><\/p>\n<p>In today&#8217;s ever-changing urban landscape, offering convenient parking for commercial buildings, and serving the daily commute of many individuals, plays a crucial role in ensuring smooth operations. Keeping this in mind, our project focuses on establishing an integrated system\u00a0that involves a one-story office building with its floor supported by the columns of the garage. The garage is accessible by a road through a decorative tunnel.<\/p>\n<p>On this website, you will find:<\/p>\n<ul>\n<li>An understanding of the\u00a0systems\u2019 integration\u00a0context and the relationships between all five subsystems.<\/li>\n<li>Our\u00a0integrated maintenance planning, with a strong focus on maximizing the distance between two successive interventions and\/or minimizing the total maintenance duration.<\/li>\n<li>Our\u00a0Life Cycle Analysis\u00a0displays the exact costs related to energy, CO2, SO2, and NOx.<\/li>\n<li>A\u00a0multi-objective optimization\u00a0process for maintenance planning to find a balance between life cycle costs, environmental impacts, service quality, and maintenance planning for the integrated system.<\/li>\n<\/ul>\n<hr \/>\n<p>&nbsp;<\/p>\n<p><strong>Table Of Contents<\/strong><\/p>\n<ul>\n<li><a title=\"Integration Context of the Civil Systems\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=17057\"><strong><strong>Integration Context of the Civil Systems<\/strong><\/strong><\/a>\n<ul>\n<li><a title=\"Road Pavement System\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=17067\">Road Pavement System<\/a><\/li>\n<li><a title=\"Tunnel System\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=17080\">Tunnel System<\/a><\/li>\n<li><a title=\"RC Columns\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=17082\">RC\u00a0Columns\u00a0<\/a><\/li>\n<li><a title=\"Floor System\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=17089\">Floor System<\/a><\/li>\n<li><a title=\"Bamboo Walls\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=17086\">Bamboo Walls<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a title=\"Integrated Maintenance Planning\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=17061\"><strong>Integrated Maintenance Planning<\/strong><\/a><\/li>\n<li><a title=\"Life Cycle Inventory\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=17063\"><strong>Life Cycle Inventory<\/strong><\/a><\/li>\n<li><a title=\"Multi-Objective Optimization\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=17065\"><strong>Multi-Objective Optimization<\/strong><\/a><\/li>\n<li><a title=\"Conclusion\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=19097\">Conclusion\u00a0<\/a><\/li>\n<\/ul>\n<hr \/>\n<p>&nbsp;<\/p>\n<p><strong>Members<\/strong><\/p>\n<ul>\n<li>Samah\u00a0Abdulatif<\/li>\n<li>Helia Haghighipanah<\/li>\n<li>Jorg Theunissen<\/li>\n<li>Siyuan Wu<\/li>\n<li>Jianwen Wang<\/li>\n<li>Ehsan Ahmadi<\/li>\n<\/ul>\n<hr \/>\n<p>&nbsp;<\/p>\n<p><b>Downloads<\/b><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/Rscript_LCA_GroupD.zip\">rscript_lca_groupd<\/a><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n<p><strong>References<\/strong><\/p>\n<ul>\n<li><a href=\"http:\/\/www.sciencedirect.com\/science\/article\/pii\/S0951832005002012?casa_token=1bPDAIBmAx8AAAAA:sBzRq0YZwJvVp1-TCCllDd52ZURTPazmjhQHziGmOzVtioLkLJ44nBMxV-zxtZsh4KlxzPCBL0U\">Multi-objective optimization using genetic algorithms: A tutorial<\/a><\/li>\n<li><a href=\"http:\/\/direct.mit.edu\/evco\/article-abstract\/22\/4\/651\/994\/Pareto-Front-Estimation-for-Decision-Making\">Pareto Front Estimation for Decision Making<\/a><\/li>\n<li><a href=\"http:\/\/eurocodes.jrc.ec.europa.eu\/EN-Eurocodes\/eurocode-2-design-concrete-structures\">EN 1992-1-1:2004 Eurocode 2: Design of concrete structures &#8211; Part 1-1: General rules and rules for buildings<\/a><\/li>\n<li><a href=\"http:\/\/www.researchgate.net\/publication\/337633621_Evaluation_of_Cost_Analyses_for_Earthquake_Resistant_Reinforced_Concrete_Buildings_Based_on_Malaysian_National_Annex_to_Eurocode_8\">Evaluation of Cost Analyses for Earthquake Resistant Reinforced<\/a><\/li>\n<li><a href=\"https:\/\/www.sciencedirect.com\/science\/article\/abs\/pii\/S2352710218305321\">Life cycle assessment (LCA) and cost (LCC) studies of lightweight composite flooring systems<\/a><\/li>\n<li><a href=\"https:\/\/www.sciencedirect.com\/science\/article\/pii\/S0048969722050367\">Life cycle assessment of bamboo products: Review and harmonization<\/a><\/li>\n<li><a href=\"https:\/\/www.mdpi.com\/1996-1944\/16\/19\/6540\">Comparative Life Cycle Assessment (LCA) of Porous Asphalt Mixtures<\/a><\/li>\n<li><a href=\"http:\/\/https:\/\/www.researchgate.net\/publication\/264863642_The_importance_of_the_use_phase_on_the_LCA_of_environmentally_friendly_solutions_for_asphalt_road_pavements\">The importance of the use phase on the LCA of environmentally friendly solutions for asphalt road pavements<\/a><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Introduction In today&#8217;s ever-changing urban landscape, offering convenient parking for commercial buildings, and serving the daily commute of many individuals, plays a crucial role in ensuring smooth operations. Keeping this in mind, our project<a class=\"read-more\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=16713\">Continue reading<\/a><\/p>\n","protected":false},"author":191,"featured_media":0,"parent":15648,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-16713","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/16713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/users\/191"}],"replies":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16713"}],"version-history":[{"count":46,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/16713\/revisions"}],"predecessor-version":[{"id":19110,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/16713\/revisions\/19110"}],"up":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/15648"}],"wp:attachment":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}