{"id":16305,"date":"2024-02-06T08:36:00","date_gmt":"2024-02-06T08:36:00","guid":{"rendered":"http:\/\/141.23.68.248\/wp\/?page_id=16305"},"modified":"2024-02-13T09:05:59","modified_gmt":"2024-02-13T09:05:59","slug":"community-multi-purpose-building","status":"publish","type":"page","link":"http:\/\/141.23.68.248\/wp\/?page_id=16305","title":{"rendered":"Community Multi-Purpose Building"},"content":{"rendered":"<h3>1. Introduction<\/h3>\n<p style=\"text-align: justify;\">The use of Life Cycle Assessment (LCA) to understand environmental impacts can significantly facilitate decision-making when selecting a design option, provided that the chosen design minimizes environmental impact throughout its lifetime. The objective is to select a building subsystem option by assessing life-cycle impacts and utilizing Multi-Criteria Decision-Making method AHP. As a subsystem a slab is chosen for\u00a0a community multipurpose building. (The references are given in the Full Report at the end of the page.)<\/p>\n<h3>2. Goal and Scope<\/h3>\n<p style=\"text-align: justify;\">In this analysis, the scope extends from cradle to grave, encompassing the marked categories presented in the figure below. The functional unit for all elements, except for reinforcement, is m\u00b3, whereas for reinforcement, it is kg. The objective is to conduct an ecological footprint analysis, considering energy, CO2, PO4, and SO2 as criteria and the design options as the alternatives.<\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-18430\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/aaaa.png\" alt=\"aaaa\" width=\"674\" height=\"507\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/aaaa.png 674w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/aaaa-300x226.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/aaaa-520x391.png 520w\" sizes=\"auto, (max-width: 674px) 100vw, 674px\" \/><\/p>\n<h3 style=\"text-align: justify;\">3. Design Options<\/h3>\n<p>Three possible slab design options are shown in Table 1. Material and dimensions are provided in Table 2.<\/p>\n<figure id=\"attachment_16584\" aria-describedby=\"caption-attachment-16584\" style=\"width: 263px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t21.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-16584\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t21-263x300.png\" alt=\"Table 1: Slab Design options.\" width=\"263\" height=\"300\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t21-263x300.png 263w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t21-520x592.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t21.png 605w\" sizes=\"auto, (max-width: 263px) 100vw, 263px\" \/><\/a><figcaption id=\"caption-attachment-16584\" class=\"wp-caption-text\">Table 1: Slab Design options.<\/figcaption><\/figure>\n<figure id=\"attachment_16585\" aria-describedby=\"caption-attachment-16585\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t3.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-16585\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t3-300x170.png\" alt=\"Table 2: Slab Design option parameter. \" width=\"300\" height=\"170\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t3-300x170.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t3-520x294.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t3.png 605w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-16585\" class=\"wp-caption-text\">Table 2: Slab Design option parameter.<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">The table above contains the dimensions of the design options elements. For simplification, the analysis will not consider connectors such as screws, shear studs, and steel trimmers. All slabs have a span of 7 m and support a live load of 2.5 kN\/m\u00b2 over a 50-year period.<\/p>\n<h3>4. Life Cycle Inventory<\/h3>\n<p style=\"text-align: justify;\">The environmental indicators based on the slab materials were collected using the sources listed in the table below.\u00a0To simplify the R implementation and address vector creation issues caused by diverse scopes of composite elements, they were combined into a single entity. It&#8217;s essential to recognize that each element has unique volume, environmental values, and functional units.<\/p>\n<figure id=\"attachment_16680\" aria-describedby=\"caption-attachment-16680\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t4.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-16680\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t4-300x151.png\" alt=\"Table 3: environmental indicator values for design option materials\" width=\"300\" height=\"151\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t4-300x151.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t4-520x262.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t4.png 605w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-16680\" class=\"wp-caption-text\">Table 3: environmental indicator values for design option materials<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">Two critical steps in computing the final values for the LCI will be briefly outlined. Concerning the hollow core slab, an additional assumption was made, and an equivalent thickness of the slab was calculated, encompassing only the concrete volume by deducting the hollow cores. The material for the slab itself and the concrete topping above it were selected to be identical.<\/p>\n<figure id=\"attachment_16681\" aria-describedby=\"caption-attachment-16681\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t5.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-16681\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t5-300x157.png\" alt=\"Table 4: final values for the LCI and legend\" width=\"300\" height=\"157\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t5-300x157.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t5-520x272.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t5.png 607w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-16681\" class=\"wp-caption-text\">Table 4: final values for the LCI and legend<\/figcaption><\/figure>\n<h3>4. Life Cycle Timeline<\/h3>\n<p style=\"text-align: justify;\">Every design option requires material dependent interventions with specific frequency which as mentioned are going to be encountered in the LCA later on. The following table contains basic interventions for given event examples.<\/p>\n<figure id=\"attachment_16682\" aria-describedby=\"caption-attachment-16682\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t6.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-16682\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t6-300x136.png\" alt=\"Table 4: Intervention for the three Design options,\" width=\"300\" height=\"136\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t6-300x136.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t6-520x236.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t6.png 605w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-16682\" class=\"wp-caption-text\">Table 5: Intervention for the three Design options.<\/figcaption><\/figure>\n<p>The frequencies of needed interventions, were set according to the references in the table and the described assumptions in Table 6.<\/p>\n<figure id=\"attachment_16683\" aria-describedby=\"caption-attachment-16683\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t7.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-16683\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t7-300x181.png\" alt=\"Table 3-2: final Data for the Life Cycle Inventory Analysis\" width=\"300\" height=\"181\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t7-300x181.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t7-520x315.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t7.png 605w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-16683\" class=\"wp-caption-text\">Table 6: final Data for the Life Cycle Inventory Analysis<\/figcaption><\/figure>\n<h3>6. Life Cycle Analysis<\/h3>\n<p style=\"text-align: justify;\">The results of the Life Cycle Inventory Analysis were computed using R, which facilitated the determination of material quantities for each slab and the total material needed for every design option. Subsequently, the environmental indicators were applied to calculate the corresponding environmental impacts for each option. The findings are presented in the following barplots.<\/p>\n<figure id=\"attachment_16685\" aria-describedby=\"caption-attachment-16685\" style=\"width: 605px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t8.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-16685\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t8.png\" alt=\"Table 4-1: Barplots for the resulting environmental indicators of each design option\" width=\"605\" height=\"575\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t8.png 605w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t8-300x285.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t8-520x494.png 520w\" sizes=\"auto, (max-width: 605px) 100vw, 605px\" \/><\/a><figcaption id=\"caption-attachment-16685\" class=\"wp-caption-text\">Table 7: Barplots for the resulting environmental indicators of each design option<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">The environmental indicator that exhibits the most variation among the three design options is carbon emissions. Option 2 has the lowest, even a negative value, possibly influenced by the bio-chemical behaviour of wood over its lifetime and the very good recycling properties. Simultaneously, Option 2 shows the highest PO4 emissions. Energy consumption is comparable across all three options. The most even distribution of emissions is observed in design Option 3. Based on these plots alone, it becomes evident that achieving the goal of ranking the slabs based on ecological emissions depends on the weighting of the categories.<\/p>\n<h3>\u00a07.\u00a0MCDM \u2013 Analytic Hierarchy Process<\/h3>\n<p style=\"text-align: justify;\">The AHP is employed for ranking slab options by assigning relative weights to criteria and alternatives, converting subjective assessments into ratio scales.\u00a0The pairwise comparison of alternatives is facilitated using barplots in Table 8, with Saaty\u2019s scale used for weighting.<\/p>\n<figure id=\"attachment_16686\" aria-describedby=\"caption-attachment-16686\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t9.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-16686\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t9-300x165.png\" alt=\"Table 5-1: Criteria Priority Weight for Research Metric.\" width=\"300\" height=\"165\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t9-300x165.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t9-520x286.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t9.png 545w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-16686\" class=\"wp-caption-text\">Table 8: Criteria Priority Weight for Research Metric.<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">Since CO2 is the main key indicator according to the organization for economic and co-operation (OECD), it will be assigned the highest weight, followed by SO2 and energy based on their ranking. Since PO4 is not considered a key indicator, it will carry the least weight.<\/p>\n<figure id=\"attachment_16687\" aria-describedby=\"caption-attachment-16687\" style=\"width: 605px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t10.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-16687\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t10.png\" alt=\"Figure 1: Ranking of the design options using AHP\" width=\"605\" height=\"438\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t10.png 605w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t10-300x217.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/t10-520x376.png 520w\" sizes=\"auto, (max-width: 605px) 100vw, 605px\" \/><\/a><figcaption id=\"caption-attachment-16687\" class=\"wp-caption-text\">Figure 1: Ranking of the design options using AHP<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">Regarding the results, it seems that Option 2 \u2013 the GLT concrete slab is the most favourable choice. This is likely because CO2 was highly prioritized in the pairwise comparison of the criteria. The precast hollow core slab appears to be a better option than the Cofradal slab. While the results are satisfactory based on the current ranking and scope, they can change when specific or varied goals are considered.<\/p>\n<p style=\"text-align: justify;\">In conclusion, using the information provided in the assignment and considering the set goal and scope, the &#8220;best&#8221; option depends on the weighted criteria. This underscores the multi-criteria nature of the decision problem. At this point, applying sensitivity analyses would be very useful.<\/p>\n<h4>Downloadable Content<\/h4>\n<p>Full Report:\u00a0<a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2024\/02\/LCA-Assignment_2_Tala-Ramadan.pdf\">Tala Nada Fatima Ramadan<\/a><\/p>\n<hr \/>\n<h5>|\u00a0<a href=\"http:\/\/141.23.68.248\/wp\/?page_id=15781\">Main Page<\/a>\u00a0|\u00a0<a href=\"http:\/\/141.23.68.248\/wp\/?page_id=16288\">Introduction<\/a>\u00a0|\u00a0<a href=\"http:\/\/141.23.68.248\/wp\/?page_id=16290\">Integration Context of the Civil Systems<\/a>\u00a0|\u00a0<a href=\"http:\/\/141.23.68.248\/wp\/?page_id=16292\">Maintenance Strategies\u00a0<\/a>|\u00a0<a href=\"http:\/\/141.23.68.248\/wp\/?page_id=16294\">Life Cycle Analysis<\/a>\u00a0|\u00a0<a href=\"http:\/\/141.23.68.248\/wp\/?page_id=16297\">Multi-Objective Optimization<\/a>\u00a0|<\/h5>\n","protected":false},"excerpt":{"rendered":"<p>1. Introduction The use of Life Cycle Assessment (LCA) to understand environmental impacts can significantly facilitate decision-making when selecting a design option, provided that the chosen design minimizes environmental impact throughout its lifetime. The objective<a class=\"read-more\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=16305\">Continue reading<\/a><\/p>\n","protected":false},"author":190,"featured_media":0,"parent":16290,"menu_order":1,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-16305","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/16305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/users\/190"}],"replies":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16305"}],"version-history":[{"count":11,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/16305\/revisions"}],"predecessor-version":[{"id":18431,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/16305\/revisions\/18431"}],"up":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/16290"}],"wp:attachment":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}