{"id":1574,"date":"2019-02-05T09:19:12","date_gmt":"2019-02-05T09:19:12","guid":{"rendered":"http:\/\/141.23.68.248\/wp\/?page_id=1574"},"modified":"2021-01-25T10:08:57","modified_gmt":"2021-01-25T10:08:57","slug":"single-family-house","status":"publish","type":"page","link":"http:\/\/141.23.68.248\/wp\/?page_id=1574","title":{"rendered":"Single Family House"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1594 alignright\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/lichtinspiration_efh_01-g-300x200.jpg\" alt=\"lichtinspiration_efh_01-g\" width=\"300\" height=\"200\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/lichtinspiration_efh_01-g-300x200.jpg 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/lichtinspiration_efh_01-g-390x260.jpg 390w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/lichtinspiration_efh_01-g-520x346.jpg 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/lichtinspiration_efh_01-g-740x492.jpg 740w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/lichtinspiration_efh_01-g.jpg 1000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1593 alignleft\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Einfamilienhaus-Nebenkosten-720x480-300x200.jpg\" alt=\"einfamilienhaus-nebenkosten-720x480\" width=\"300\" height=\"200\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Einfamilienhaus-Nebenkosten-720x480-300x200.jpg 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Einfamilienhaus-Nebenkosten-720x480-390x260.jpg 390w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Einfamilienhaus-Nebenkosten-720x480-520x347.jpg 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Einfamilienhaus-Nebenkosten-720x480.jpg 720w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>System: Prefabricated House<\/p>\n<p>Component: Outer Building Wall<\/p>\n<p>The prefabricated house used as a single-family home is the basis for this system. \u201cHome inhabitability\u201d was chosen as the main high-performance criteria. For this purpose, the selected component in the analysis is the \u201couter building wall\u201d that is the most important structure element for sound emission protection. The wall consists of two concrete layers that are separated with an insulation wall with the defining parameters being wall length, height and thickness. Figure 1, derived from [1], shows the general layout of the chosen component:<\/p>\n<figure id=\"attachment_2297\" aria-describedby=\"caption-attachment-2297\" style=\"width: 142px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/W\u00e4nde-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2297\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/W\u00e4nde-2.jpg\" alt=\"wande-2\" width=\"142\" height=\"328\" \/><\/a><figcaption id=\"caption-attachment-2297\" class=\"wp-caption-text\">Figure 1: Double-layered concrete wall<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Prefabricated concrete elements can stand firmly for over 100 years, when maintained constantly. Depending on the concrete quality, the expected service time of such a wall lies around 60-100 years. The maintenance efforts for solid concrete walls are generally small, but to ensure proper noise insulation it is advised to maintain the wall every 7 to 13 years (M.h = Maintenance), closing several cracks in the wall or other openings. Most walls are also coated with inner and outer plastering for additional chloride failure protection which needs to be replaced every 10 to 20 years (PR.h = Plaster Renewal) depending on local weather events. While not common practice due to higher maintenance costs, it is also recommended that outer concrete walls are completely replaced every 50 to 59 years (CR.h = Complete Replacement) when the building near a water-contested area with higher atmospheric humidity, because concrete deterioration rises rapidly under such circumstances.<\/p>\n<p>Figure 2 shows the maintenance timeline when all maintenance actions are executed as much as possible. This cost-intensive measure is used when the sound insulation and building component condition always needs to be at the highest performing state. Such conditions are more commonly required in areas with higher earthquake expectancies.<\/p>\n<figure id=\"attachment_2299\" aria-describedby=\"caption-attachment-2299\" style=\"width: 1461px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Shortest.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2299 size-full\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Shortest.png\" alt=\"shortest\" width=\"1461\" height=\"491\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Shortest.png 1461w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Shortest-300x101.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Shortest-1024x344.png 1024w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Shortest-520x175.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Shortest-740x249.png 740w\" sizes=\"auto, (max-width: 1461px) 100vw, 1461px\" \/><\/a><figcaption id=\"caption-attachment-2299\" class=\"wp-caption-text\">Figure 2: Shortest maintenance intervals<\/figcaption><\/figure>\n<p>With Figure 3, the opposite of maintenance frequency is shown. This measure represents the most-cost effective option, when the components are not expected to be at its highest performance all the time in more favorable conditions. These conditions are more common in areas without much outside influence on the building.<\/p>\n<figure id=\"attachment_2300\" aria-describedby=\"caption-attachment-2300\" style=\"width: 1453px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Longest1.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2300 size-full\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Longest1.png\" alt=\"longest\" width=\"1453\" height=\"485\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Longest1.png 1453w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Longest1-300x100.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Longest1-1024x342.png 1024w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Longest1-520x174.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2019\/02\/Longest1-740x247.png 740w\" sizes=\"auto, (max-width: 1453px) 100vw, 1453px\" \/><\/a><figcaption id=\"caption-attachment-2300\" class=\"wp-caption-text\">Figure 3: Longest maintenance intervals<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Sources:<\/p>\n<p>[1] Beton.org, 2019. W\u00e4nde aus Beton.<\/p>\n<p><a href=\"https:\/\/www.beton.org\/wissen\/wohnungsbau\/wand\/\">https:\/\/www.beton.org\/wissen\/wohnungsbau\/wand\/<\/a><\/p>\n<p>[2] Soundproofing Company, 2019. The Triple Leaf Effect &amp; Air Cavity Depth.<\/p>\n<p><a href=\"https:\/\/www.soundproofingcompany.com\/soundproofing101\/triple-leaf-effect\/\">https:\/\/www.soundproofingcompany.com\/soundproofing101\/triple-leaf-effect\/<\/a><\/p>\n<p>[3] facilitiesnet, 2019. Wall Maintenance Depends on Construction Type.<\/p>\n<p><a href=\"https:\/\/www.facilitiesnet.com\/ceilingsfurniturewalls\/article\/Wall-Maintenance-Depends-on-Construction-Type--10226\">https:\/\/www.facilitiesnet.com\/ceilingsfurniturewalls\/article\/Wall-Maintenance-Depends-on-Construction-Type&#8211;10226<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; System: Prefabricated House Component: Outer Building Wall The prefabricated house used as a single-family home is the basis for this system. \u201cHome inhabitability\u201d was chosen as the main high-performance<a class=\"read-more\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=1574\">Continue reading<\/a><\/p>\n","protected":false},"author":24,"featured_media":0,"parent":1488,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-1574","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/1574","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1574"}],"version-history":[{"count":6,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/1574\/revisions"}],"predecessor-version":[{"id":2302,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/1574\/revisions\/2302"}],"up":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/1488"}],"wp:attachment":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}