{"id":11438,"date":"2023-01-31T18:30:14","date_gmt":"2023-01-31T18:30:14","guid":{"rendered":"http:\/\/141.23.68.248\/wp\/?page_id=11438"},"modified":"2023-02-14T06:35:32","modified_gmt":"2023-02-14T06:35:32","slug":"3-life-cycle-inventory-and-analysis","status":"publish","type":"page","link":"http:\/\/141.23.68.248\/wp\/?page_id=11438","title":{"rendered":"3. Life Cycle Inventory and Analysis"},"content":{"rendered":"<p style=\"text-align: left;\">Engineering project systems all have the characteristics of one-time production and long life cycle. Once such a high-energy-consuming system project system is formed, it will be difficult to carry out energy-saving transformation, and it will also increase the load on energy and the environment. so. We will analyze the environmental load and energy consumption generated by the whole life process of the system it produces.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/\u56fe\u72471.png\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-12399 aligncenter\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/\u56fe\u72471.png\" alt=\"%e5%9b%be%e7%89%871\" width=\"835\" height=\"502\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/\u56fe\u72471.png 835w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/\u56fe\u72471-300x180.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/\u56fe\u72471-520x313.png 520w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/\u56fe\u72471-740x445.png 740w\" sizes=\"auto, (max-width: 835px) 100vw, 835px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><em>Figure 1: Lifecycle scope of an integrated system<\/em><\/p>\n<p style=\"text-align: left;\">Life cycle analysis takes into account the costs associated with energy consumption and greenhouse gas emissions.<\/p>\n<table style=\"height: 257px;\" width=\"487\">\n<tbody>\n<tr>\n<td width=\"355\"><\/td>\n<td width=\"355\">cost<\/td>\n<\/tr>\n<tr>\n<td width=\"355\">CO<sub>2<\/sub><\/td>\n<td width=\"355\">26\u20ac per metric tone<\/td>\n<\/tr>\n<tr>\n<td width=\"355\">SO<sub>2<\/sub><\/td>\n<td width=\"355\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">85\u20ac per metric tone<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"355\">NO<sub>X<\/sub><\/td>\n<td width=\"355\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">42\u20ac per metric tone<\/span><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"355\">Energy<\/td>\n<td width=\"355\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">0.128<\/span><\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>To complete the analysis of the integrated system portfolio, a complete bill of materials is drawn up.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/13546b6b572000706f11ffa00fffab5.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-12426\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/13546b6b572000706f11ffa00fffab5.png\" alt=\"13546b6b572000706f11ffa00fffab5\" width=\"641\" height=\"772\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/13546b6b572000706f11ffa00fffab5.png 641w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/13546b6b572000706f11ffa00fffab5-249x300.png 249w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/13546b6b572000706f11ffa00fffab5-520x626.png 520w\" sizes=\"auto, (max-width: 641px) 100vw, 641px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><em>Table: System Bill of Materials<\/em><\/p>\n<p>A comprehensive assessment of life cycle emissions of integrated civil engineering systems gives the following total energy, emissions and cost results.<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"141\">Energy<\/td>\n<td width=\"141\">CO2<\/td>\n<td width=\"142\">NOx<\/td>\n<td width=\"142\">SO2<\/td>\n<td width=\"142\">Cost<\/td>\n<\/tr>\n<tr>\n<td width=\"141\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">203295.1<\/span><\/span><\/td>\n<td width=\"141\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">1279436106<\/span><\/span><\/td>\n<td width=\"142\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">421714378<\/span><\/span><\/td>\n<td width=\"142\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">139755312<\/span><\/span><\/td>\n<td width=\"142\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">62.85657<\/span><\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-12428 aligncenter\" src=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/f607829355cff776afd05104ca3c640.png\" alt=\"f607829355cff776afd05104ca3c640\" width=\"602\" height=\"362\" srcset=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/f607829355cff776afd05104ca3c640.png 602w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/f607829355cff776afd05104ca3c640-300x180.png 300w, http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/f607829355cff776afd05104ca3c640-520x313.png 520w\" sizes=\"auto, (max-width: 602px) 100vw, 602px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><em>Figure 2: Energy and emissions ratios for integrated systems<\/em><\/p>\n<p style=\"text-align: left;\">The graph above shows the emissions and energy consumption of this integrated system. It can be seen that the main source of system impact on the environment is CO2 emissions.<\/p>\n<hr \/>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=11433\" target=\"_blank\">1. Integration context of the civil systems<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=11585\" target=\"_blank\">Earth Rock Dam<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=11577\" target=\"_blank\">Highway Bridge<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=11442\" target=\"_blank\">Pavement Overlay System<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=11582\" target=\"_blank\">Road Pavement<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=11580\" target=\"_blank\">Wooden Bridge<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=11436\" target=\"_blank\">2. Integrated Maintenance Planning<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=11438\" target=\"_blank\">3. Life Cycle Inventory and Analysis<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/?page_id=11440\" target=\"_blank\">4. Multi-Objective Optimization<\/a><\/p>\n<p><a href=\"http:\/\/141.23.68.248\/wp\/wp-content\/uploads\/2023\/01\/Group-F-R-Script.zip\">group-f-r-script<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Engineering project systems all have the characteristics of one-time production and long life cycle. Once such a high-energy-consuming system project system is formed, it will be difficult to carry out energy-saving transformation, and it will<a class=\"read-more\" href=\"http:\/\/141.23.68.248\/wp\/?page_id=11438\">Continue reading<\/a><\/p>\n","protected":false},"author":164,"featured_media":0,"parent":11373,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-11438","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/11438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/users\/164"}],"replies":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11438"}],"version-history":[{"count":7,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/11438\/revisions"}],"predecessor-version":[{"id":14932,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/11438\/revisions\/14932"}],"up":[{"embeddable":true,"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=\/wp\/v2\/pages\/11373"}],"wp:attachment":[{"href":"http:\/\/141.23.68.248\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}